Proposed civil work under the SIP described below-

1. Re-excavation of Hadiadanga khal = 6.010 Km
2. Re-excavation of Hadiadanga khal-01 = 2.735 Km
3. Re-excavation of Hadiadanga khal -02 = 3.500 Km
4. Re-excavation of Burir khal = 2.600 Km
5. Re-excavation of Helencha khal = 0.650 Km
6. Repair of Hidadangi regulator (6 Vents)
7. Repair of Helencha regulator (1 Vent )
8. Repair of Shirgram pipe sluice (900 mm)