• donor
  • bwdb
  • javascript carousel
  • gon

Search tender



     
Total Live Tenders are: 8
SL Package No Tender Name Procuring EntityPublish Date Closing Date Download
1 RAJ-HR-REG-I-W01-17 Repair of Belgachi 3-vent regulator Rupsha 1-vent regulator and Protective work at U/S and D/S of existing Rajapur 8-vent regulator over Horai river and Rupsha khal in Horai River Sub-Project in c/w SWAIWRPMP-AF at Upazila- Rajbari Sadar and Kalukhali District-Rajbari Under Rajbari O & M Division. SMO Rajbari O&M Division 06/11/2019 09/12/2019 Corrigendum
Notice
2 MAG-CWD-REG-I-W01-19 Manufacturing, Supplying & Installation of 14 Nos. M.S Lift Gate (size: 1.65m x 1.95m = 11 Nos. & 1.35m x 1.35m = 3 Nos.), 9 Nos. M.S. Flap gate (size: 1.65m x 1.95m = 7 Nos. & Size- 1.35m x 1.35m = 2 nos.) and 14 Nos. hand wheel type hoisting device for Bamunkhali-Barnali Sub-Project at Magura O&M Division, BWDB, Magura and 1 No. M.S. Lift gate (Size- 1.65m x 1.95m) with hand Central Workshop Division 29/10/2019 28/11/2019 Notice
3 MAG-CWD-REG-I-W01-18 Manufacturing, Supplying & Installation of 10 Nos. M.S Lift Gate (size: 1.65m x 1.95m = 7 Nos. & 1.35m x 2.35m = 3 Nos.) 8 Nos. M.S. Flap gate (size: 1.65m x 1.95m = 7 Nos., 1.35m x 1.35m = 1 No.), 10 Nos Hand Wheel Type Hoisting Device for BamunkhaliBarnali Sub-Project at Magura O&M Division, BWDB, Magura and 3 Nos Hand Wheel Type and 6 Nos Pedestal Type Hoisting Device for Ho Central Workshop Division 29/10/2019 28/11/2019 Notice
4 NAR-BB-KEX-I-W06-32 Re-Excavation of Bamonkhali khal from km. 0.000 to Km. 5.900 Km Jia khal from km 0.000 to Km 3.930 Km Shadhukhali khal from km. 0.000 to Km. 4.075 Km Shahabad khal From km. 0.000 to Km. 0.718 Km Solua khal From km. 0.000 to Km. 2.660 Km Total 17.283 Km in Bamunkhali-Barnali Sub-Project under South-West Area Integrated Water Resources Planning and Management Project year 2019-20 Narail O&M Division 28/10/2019 27/11/2019 Notice
5 NAR-BB-WTC-I-W08-11 Construction of Typical Building of WMG Training centre Bamankhali-Barnali Sub-Project under South-West Area Integrated Water Resources Planning and Management Project (SWAIWRPMP) Phase- under Narail O&M Division BWDB Narail during the year 2019-2020. Narail O&M Division 28/10/2019 27/11/2019 Notice
6 MAG-KA-BC-I-W12-02 Bitumenous Carpetting Road (from km. 6.300 to km 12.600) over Kalidaskhali-Arpara Flood Control Embankment in C/W South-West Area Water Resources Planning and Management Project (SWAIWRPMP) Phase-2 under Kalidaskhali-Arpara Sub Project Under Magura O&M Division BWDB during the Year-2019-20. SMO Magura O&M Divsion 22/10/2019 21/11/2019 Notice
7 MAG-KA-BC-I-W12-01 Bitumenous Carpetting Road (from km. 0.000 to km 6.300) over Kalidaskhali-Arpara Flood Control Embankment in C/W South-West Area Water Resources Planning and Management Project (SWAIWRPMP) Phase-2 under Kalidaskhali-Arpara Sub Project Under Magura O&M Division BWDB during the Year-2019-20. SMO Magura O&M Divsion 22/10/2019 21/11/2019 Notice
8 SD-CF-FB-I-W13-01 Construction of Foot Bridge at km. 1.212 on Baniabari khal near Dinabandhu Mandal house in Chatler-Fakurhat Sub-project, Upazila- Bhanga Dist.-Faridpur under Specialized Division, BWDB, Faridpur during the year 2019-20. SMO Faridpur O&M Division 21/10/2019 21/11/2019 Notice

Go to top of page