Total Awarded Tenders are: 38
SL Package No Tender NamePublish Date Closing Date Details Download
1 MAG-KA-REG-I-W01-05 Construction of Boyra Regulator (2V-1.80M X 3.00M) at Km.0.300 of Kalidaskhali Khal in Kalidaskhali - Arpara Sub-Project within 'SAIWRPMP-AF"Upazila: Shalikha, District: Magura ,under Magura O&M Division, BWDB, Magura during the year 2018-19 & 2019-20.
(Contract Awarded)
05/02/2019 11/03/2019 Details Notice
Contract Awarded:
Contractor: M/S. Kamrul Enterprise
Signing Date: 23/04/2019
Contract Value: 28470156.501
Commencement Date: 23/04/2019 Completion Date: 21/06/2019
2 FAR-BS-REG-I-W01-04 Construction of Joyjhap Regulator 5V-1.50M x 1.80M at KM 0.495 of Kuchiamara Khal-01 in C/W Beel Sukunia Sub-Project under Southwest Area Integrated Water Resources Planning & Management Project 2nd Phase under Faridpur O & M Division during 2018-19 & 2019-20.
(Contract Awarded)
30/01/2019 04/03/2019 Details Notice
Contract Awarded:
Contractor: Azam Construction- M/S. Lipu Enterprise (JV)
Signing Date: 30/05/2019
Contract Value: 56183643.847
Commencement Date: 09/06/2019 Completion Date: 30/05/2020
3 SD-DK-REG-I-W01-03 Repair of Toiljuri 2-vent Hashemdia 1-vent and Kaliando 1- vent Regulator total 3 nos Regulator in c/w Daduria & Kandor Beel Sub-Project Upazila- Boalmari Dist.-Faridpur under Specialized Division BWDB Faridpur during the year 2018-19.
(Contract Awarded)
23/12/2018 22/01/2019 Details Notice
Contract Awarded:
Contractor: M/S.Azam Construction - M/S.Rafeea Construction (JV)
Signing Date: 28/03/2019
Contract Value: 9734180.023
Commencement Date: 31/03/2019 Completion Date: 11/02/2020
4 SD-AB-REG-I-W01-02 Repair of Hidadanga 6- vent Mohisherghop 4-vent Arpara 3-vent Utholi 3-vent and Helencha1-vent Regulator total 5 nos Regulator in c/w Alfadanga-Boalmari Sub-Project Upazila- Alfadanga Dist.-Faridpur under Specialized Division BWDB Faridpur during the year 2018-19.
(Contract Awarded)
23/12/2018 22/01/2019 Details Notice
Contract Awarded:
Contractor: M/S.Azam Construction - M/S.Rafeea Construction (JV)
Signing Date: 28/03/2019
Contract Value: 18278000
Commencement Date: 09/04/2019 Completion Date: 26/01/2020
5 MAG-KA-KEX-I-W06-28 Re-excavation of Kalidaskhali Khal from km Branch-1 Khal from km 0.000 to km. 1.250 = 1.250 km &Kalidaskhali Branch-2 Khal from km 0.000 to km. 1.790 = 1.790 km (Total = 8.140 Km) in C/W KalidasKhali-Arpar Sub Project under South-West Area Integrated Water Resources Planning and Management Project (SWAIWRPMP) Phase-2 under Under Magura O&M Division BWDB during the Year-2018-19.
(Contract Awarded)
19/12/2018 21/01/2019 Details Notice
Contract Awarded:
Contractor: M/S Jakaullah & Brothers
Signing Date: 20/02/2019
Contract Value: 17665792.167
Commencement Date: 20/02/2019 Completion Date: 20/06/2019
6 MAG-KA-KEX-I-W06-27 Re-excavation of 1. Digholgram Khal from km 0.000 to km. 6.150 = 6.150 km, 2. Digholgram Branch-1 Khal from km 0.000 to km. 0.900 = 0.900 km, 3. Digholgram Branch-2 Khal from km 0.000 to km. 0.550 = 0.550 km & 4. Digholgram Branch-3 Khal from km 0.000 to km. 1.300 = 1.300 km Total = 8.900 Km in C/W KalidasKhali-Arpar Sub Project under South-West Area Integrated Water Resources
(Contract Awarded)
02/12/2018 03/01/2019 Details Notice
Contract Awarded:
Contractor: M/S Jakaullah & Brothers
Signing Date: 03/02/2019
Contract Value: 9704797.775
Commencement Date: 04/02/2019 Completion Date: 21/06/2019
7 RAJ-HR-KEX-I-W06-25 Re-excavation of Rupsha Khal from KM 0.00 to 6.600 KM of Horai River Sub-Project in c/w " Southwest Area Integrated Water Resources Planning and Management Project - Additional Financial " in Upazilla Kalukhali & Baliakandi. Dist Rajbari under Rajbari O & M Division, BWDB, Rajbari during the year 2018-19 .
(Contract Awarded)
27/11/2018 27/12/2018 Details Notice
Contract Awarded:
Contractor: M/S Jakaullah & Brothers
Signing Date: 05/02/2019
Contract Value: 14606179.357
Commencement Date: 09/02/2019 Completion Date: 14/11/2019
8 SD-AB-KEX-I-W06-26 Re-excavation of 5.900 km Baniar Khal from km 0.000 to km 5.900 in c/w Alfadanga-Boalmari Sub-Project under SAIWRPMP-AF during the year 2018-2019.
(Contract Awarded)
19/11/2018 19/12/2018 Details Notice
Contract Awarded:
Contractor: Md.Shamimur Rahman
Signing Date: 28/01/2019
Contract Value: 15001166.376
Commencement Date: 28/01/2019 Completion Date: 27/01/2020
9 FAR-BS-KEX-I-W06-24 Re-excavation of Kuchiamara Khal-1 from km 0.000 to km 5.900 = 5900 m and Kuchiamara Khal-2 from km 0.000 to km 1.050 = 1050 m , Total = 6.950 km in c/w Beel Shukunia Sub Project under SAIWRPMP-2 under Faridpur O&M Division, BWDB, Faridpur, during the FY 2018-19.
(Contract Awarded)
31/10/2018 02/12/2018 Details Notice
Contract Awarded:
Contractor: Golam Md. Nasir
Signing Date: 29/01/2019
Contract Value: 13122476.816
Commencement Date: 30/01/2019 Completion Date: 30/05/2019
10 SD-CF-KEX-I-W06-22 Re-excavation of 4.641 km Jalukhali Khal, 0.720 km Langolkanda Khal total 5.361 km in c/w Chatler-Fakurhat Sub-Project under SAIWRPMP-AF during the year 2018-19.
(Contract Awarded)
17/09/2018 18/10/2018 Details Notice
Contract Awarded:
Contractor: M/S. Khandoker Shahin Ahmed
Signing Date: 18/11/2018
Contract Value: 10630394.625
Commencement Date: 18/11/2018 Completion Date: 17/11/2019
11 SD-AB-KEX-I-W06-23 Re-excavation of 6.010 km Hidadanga Khal, 2.600 km Burir Khal total 8.610 km in c/w Alfadanga-Boalmari Sub-Project under SAIWRPMP-AF during the year 2018-19.
(Contract Awarded)
17/09/2018 18/10/2018 Details Notice
Contract Awarded:
Contractor: M/S. Khandoker Shahin Ahmed
Signing Date: 18/11/2018
Contract Value: 10716965.92
Commencement Date: 18/11/2018 Completion Date: 17/11/2019
12 SD-CF-KEX-I-W06-21 Re-excavation of 1.770 km Sathroshi Khal, 1.290 km Baniabari Khal, 2.787 km Khatra Khal total 5.847 km in c/w Chatler-Fakurhat Sub-Project under SAIWRPMP-AF during the year 2018-19.
(Contract Awarded)
17/09/2018 18/10/2018 Details Notice
Contract Awarded:
Contractor: M/S. Khandoker Shahin Ahmed
Signing Date: 18/11/2018
Contract Value: 22387821.15
Commencement Date: 18/11/2018 Completion Date: 17/11/2019
13 RAJ-HR-KEX-I-W06-20 Re-excavation of 7.830 km of Horai River from km 25.000 to km 32.830 which is from Belgachi Regulator towards Rajapur Regulator of Horai River Sub-project in c/w Southwest Area Integrated Water Resources Planning and Management Project-2nd Phase in Upazilla- Rajbari Sadar Dist. Rajbari under Rajbari O&M Division, BWDB, Rajbari during the year of 2018-2019.
(Contract Awarded)
14/08/2018 13/09/2018 Details Notice
Contract Awarded:
Contractor: Noona Traders
Signing Date: 29/11/2018
Contract Value: 28665967.862
Commencement Date: 30/11/2018 Completion Date: 14/11/2019
14 RAJ-HR-KEX-I-W06-19 Re-excavation of 5.00 km of Horai River from km 20.000 to km 25.000 which is from Belgachi Regulator towards Rajapur Regulator of Horai River Sub-project in c/w Southwest Area Integrated Water Resources Planning and Management Project-2nd Phase in Upazilla- Rajbari Sadar Dist. Rajbari under Rajbari O&M Division, BWDB, Rajbari during the year of 2018-2019.
(Contract Awarded)
14/08/2018 13/09/2018 Details Notice
Contract Awarded:
Contractor: Mohammed Eunus & Brothers (Pvt.) Ltd.
Signing Date: 29/11/2018
Contract Value: 15938308.404
Commencement Date: 02/12/2018 Completion Date: 14/11/2019
15 RAJ-HR-KEX-I-W06-18 Re-excavation of 10.00 km of Horai River from km 10.000 to km 20.000 which is from Belgachi Regulator towards Rajapur Regulator of Horai River Sub-project in c/w Southwest Area Integrated Water Resources Planning and Management Project-2nd Phase in Upazilla- Rajbari Sadar Dist. Rajbari under Rajbari O&M Division, BWDB, Rajbari during the year of 2018-2019.
(Contract Awarded)
14/08/2018 13/09/2018 Details Notice
Contract Awarded:
Contractor: TAJWAR TRADE SYSTEM LIMITED
Signing Date: 29/11/2018
Contract Value: 18978151.127
Commencement Date: 30/11/2018 Completion Date: 14/11/2019
16 RAJ-HR-KEX-I-W06-17 Re-excavation of 5.00 km Horai River from km 5.000 to km 10.000 which is from Belgachi Regulator towards Rajapur Regulator of Horai River Sub-project in c/w Southwest Area Integrated Water Resources Planning and Management Project-2nd Phase in Upazilla-Rajbari Sadar Dist. Rajbari under Rajbari O&M Division, BWDB, Rajbari during the year of 2018-2019.
(Contract Awarded)
14/08/2018 13/09/2018 Details Notice
Contract Awarded:
Contractor: SA-SI & MD. RUHUL AMIN JV
Signing Date: 29/11/2018
Contract Value: 20898373.7
Commencement Date: 29/11/2018 Completion Date: 14/11/2019
17 RAJ-HR-KEX-I-W06-16 Re-excavation of 5.000 km of Horai River from km 0.000 to km 5.000 which is from Belgachi Regulator towards Rajapur Regulator of Horai River Sub-project in c/w Southwest Area Integrated Water Resources Planning and Management Project-2nd Phase in Upazilla- Rajbari Sadar Dist. Rajbari under Rajbari O&M Division, BWDB, Rajbari during the year of 2018-2019.
(Contract Awarded)
14/08/2018 13/09/2018 Details Notice
Contract Awarded:
Contractor: SA-SI & MD. RUHUL AMIN JV
Signing Date: 29/11/2018
Contract Value: 23015483.22
Commencement Date: 02/12/2018 Completion Date: 14/11/2019
18 RAJ-HR-KEX-I-W06-15 Re-excavation of 2.010 km of Horai River Intake from km 0.000 to km 2.010 , Padma River to Belgachi Regulator of Horai River Sub-project in c/w Southwest Area Integrated Water Resources Planning and Management Project-2nd Phase in Upazilla- Rajbari Sadar Dist. Rajbari under Rajbari O&M Division, BWDB, Rajbari during the year of 2018-2019.
(Contract Awarded)
14/08/2018 13/09/2018 Details Notice
Contract Awarded:
Contractor: Technip Corporation
Signing Date: 02/12/2018
Contract Value: 4828969.985
Commencement Date: 05/12/2018 Completion Date: 14/11/2019
19 RAJ-HR-KEX-I-W06-14 Re-excavation of 4.505 km Mora Kumar River from km 8.680 to km 13.185 of Rajbari portion Under Horai River Sub Project in c/w
(Contract Awarded)
08/08/2018 10/09/2018 Details Corrigendum
Notice
Contract Awarded:
Contractor: M/S Amin & Co.
Signing Date: 29/11/2018
Contract Value: 30445499.75
Commencement Date: 30/11/2018 Completion Date: 14/11/2019
20 RAJ-HR-KEX-I-W06-13 Re-excavation of 4.365 km Mora Kumar River from km 4.315 to km 8.680 of Rajbari portion Under Horai River Sub Project in c/w
(Contract Awarded)
08/08/2018 10/09/2018 Details Corrigendum
Notice
Contract Awarded:
Contractor: M/S Jakaullah & Brothers
Signing Date: 06/11/2018
Contract Value: 25871077.3
Commencement Date: 15/11/2018 Completion Date: 14/11/2019
21 RAJ-HR-KEX-I-W06-12 Re-excavation of Mora Kumar River from km.0.000 to km 4.315 = 4.315 km (Rajbari portion) Under Horai River Sub Project in c/w
(Contract Awarded)
08/08/2018 10/09/2018 Details Corrigendum
Notice
Contract Awarded:
Contractor: M/S Jakaullah & Brothers
Signing Date: 06/10/2018
Contract Value: 25303718.995
Commencement Date: 15/11/2018 Completion Date: 14/11/2019
22 SD-AB-ER-I-W04-02 Re-sectioning of 0.792km embankment from km. 23.700 to km. 24.492 & Construction of 1.450km retired embankment from km. 24.492/0.000 to km. 26.900/1.450 in c/w Alfadanga-Boalmari Sub-Project under SAIWRPMP-AF during the year 2017-2018 & 2018-2019.
(Contract Awarded)
25/07/2018 27/08/2018 Details Notice
Contract Awarded:
Contractor: M/S. Khandoker Shahin Ahmed
Signing Date: 11/09/2018
Contract Value: 37726976.438
Commencement Date: 11/09/2018 Completion Date: 10/09/2019
23 SD-CF-KEX-I-W06-08 Re-excavation of 8.430km Dosh Hajar Khal from km 0.000 to km 8.430 in c/w Chatler-Fakurhat Sub-Project under SAIWRPMP-AF during the year 2017-2018.
(Contract Awarded)
04/04/2018 07/05/2018 Details Notice
Contract Awarded:
Contractor: M/S Sarbick International
Signing Date: 10/06/2018
Contract Value: 15102829.757
Commencement Date: 09/06/2019 Completion Date: 09/06/2019
24 GOP-PC-RP-I-W03-01 River Bank Protection work at Daxmin Char Bhatpara to Village Joybangla along the Left Bank of Madhumati River from km. 0.878 to km 1.228 total 350 m under Southwest Area Integrated Water Resources Planning & Management Project-2nd Phase at Upazila-Kashiani District-Gopalganj under Gopalganj O & M Division BWDB Gopalganj during the year 2017-2018.
(Contract Awarded)
16/04/2018 21/05/2018 Details Corrigendum
Notice
Contract Awarded:
Contractor: Starlite Services Limited - M/S Udayan Builders (JV)
Signing Date: 20/06/2018
Contract Value: 65546312.243
Commencement Date: 20/06/2018 Completion Date: 30/12/2019
25 GOP-PC-RP-I-W03-03 River Bank Protection work at Daxmin Char Bhatpara to Village Joybangla along the Left Bank of Madhumati River from km. 1.578 to km 1.878 total 300 m under Southwest Area Integrated Water Resources Planning & Management Project-2nd Phase at Upazila-Kashiani District-Gopalganj under Gopalganj O & M Division BWDB Gopalganj during the year 2017-2018.
(Contract Awarded)
16/04/2018 17/05/2018 Details Notice
Contract Awarded:
Contractor: M/S Amin & Co.
Signing Date: 12/06/2018
Contract Value: 55554722.1
Commencement Date: 12/06/2018 Completion Date: 30/12/2019
26 GOP-PC-RP-I-W03-02 River Bank Protection work at Daxmin Char Bhatpara to Village Joybangla along the Left Bank of Madhumati River from km. 1.228 to km 1.578 total 350 m under Southwest Area Integrated Water Resources Planning & Management Project-2nd Phase at Upazila-Kashiani District-Gopalganj under Gopalganj O & M Division BWDB Gopalganj during the year 2017-2018.
(Contract Awarded)
16/04/2018 17/05/2018 Details Notice
Contract Awarded:
Contractor: M/S Amin & Co.
Signing Date: 12/06/2018
Contract Value: 61987775.72
Commencement Date: 12/06/2018 Completion Date: 30/12/2019
27 SD-CF-KEX1-I-W06-011 Re-excavation of 16.900 km Baliahati Khal from km. 0.000 to km. 16.900 in c/w Chatler-Fakurhat Sub-Project under SAIWRPMP-AF during the year 2017-18.
(Contract Awarded)
24/06/2018 26/07/2018 Details Notice
Contract Awarded:
Contractor: M/S. Khandoker Shahin Ahmed
Signing Date: 09/09/2018
Contract Value: 66613369.917
Commencement Date: 10/09/2018 Completion Date: 09/09/2019
28 MAG-KA-KEX-I-W06-09 Re-excavation of Kuatpur Khal from Km 0.000 to km. 3.900 = 3.900 km in C/W Kalidaskhali-Arpara Sub-Project under Southwest Area Integrated Water Resources Planning & Management Project (SAIWRPMP) Phase-2 under Magura O&M Division BWDB during the year 2017-18
(Contract Awarded)
18/04/2018 21/05/2018 Details Notice
Contract Awarded:
Contractor: M/S Amin & Co.
Signing Date: 25/06/2018
Contract Value: 7620295.919
Commencement Date: 25/06/2018 Completion Date: 24/06/2019
29 MAG-KA-KEX-I-W06-10 Re-excavation of Kanuda Khal from Km 0.000 to km. 12.700 = 12.700 km in C/W Kalidaskhali-Arpara Sub-Project under Southwest Area Integrated Water Resources Planning & Management Project (SAIWRPMP) Phase-2 under Magura O&M Division BWDB during the year 2017-18
(Contract Awarded)
18/04/2018 21/05/2018 Details Notice
Contract Awarded:
Contractor: M/S Jakaullah & Brothers
Signing Date: 25/06/2018
Contract Value: 24230015.4
Commencement Date: 25/06/2018 Completion Date: 24/06/2019
30 MAG-KA-ER-I-W04 -01 Re-sectioning of Flood Control Embankment from Ch. Km. 0.000 to km.12.600 12.600 Km. in KalidasKhali-Arpara sub Project under SWAIWRPMP-AF during the year 2017-2018 & 2018-2019.
(Contract Awarded)
07/03/2018 08/04/2018 Details Notice
Contract Awarded:
Contractor: M/S Liton Treders
Signing Date: 25/06/2018
Contract Value: 29836591.325
Commencement Date: 26/06/2018 Completion Date: 25/06/2019
31 I-W-08A Construction of Project Management Office (PMO) building at Faridpur [ADB loan No. 3302]
(Contract Awarded)
27/03/2017 27/04/2017 Details Notice
Contract Awarded:
Contractor: M/S Azam Construction
Signing Date: 29/06/2017
Contract Value: 39496620.65
Commencement Date: 29/06/2017 Completion Date: 28/12/2018
32 FAR-BS-KEX-I-W 06-07 Re-excavation of Beel Nalia Khal-1(Nikhordin to Kaijuri) from km 0.000 to 2.080=2.080 km & Beel Nalia Khal-2 (Mridhadangi) from km 0.000 to 6.500 km Total = (2.080+6.500) = 8.580 km in C/W Beel Shukunia Sub Project
(Contract Awarded)
28/02/2018 02/04/2018 Details Notice
Contract Awarded:
Contractor: MS NOOR CONSTRUCTION
Signing Date: 10/06/2018
Contract Value: 14561821
Commencement Date: 11/06/2018 Completion Date: 10/06/2019
33 MAG-KA-KEX-I-W06-06 Re-excavation of 4.350 km of Kuchiamora Khal from km 0.000 to km. 4.350 in C/W KalidasKhali-Arpara Sub-Project under SWAIWRPMP-AF during the year 2017-2018 & 2018-2019.
(Contract Awarded)
28/02/2018 02/04/2018 Details Notice
Contract Awarded:
Contractor: M/S Amin & Co.
Signing Date: 25/06/2018
Contract Value: 8255955.382
Commencement Date: 25/06/2018 Completion Date: 24/10/2019
34 MAG-KA-KEX-I-W06-05 Re-excavation of 2.750 km of Khathalbaria Khal from km 0.000 to km 2.750 & Re-excavation of 1.140 km of Khathalbaria Branch Khal from km 0.000 to km. 1.140 in C/W KalidasKhali-Arpara Sub-Project under SWAIWRPMP-AF during the year 2017-2018 & 2018-2019
(Contract Awarded)
28/02/2018 02/04/2018 Details Notice
Contract Awarded:
Contractor: M/S Amin & Co.
Signing Date: 25/06/2018
Contract Value: 4580684.514
Commencement Date: 25/06/2018 Completion Date: 24/09/2019
35 SD-CF-KEX-I-W06-04 Re-excavation of 1.620km Hamiddi Khal 2.150km Rajkanda Khal 1.040km Charakhali Khal 0.720km Ajgor Munshir Khal total 5.530km in c/w Chatler-Fakurhat Sub-Project under SAIWRPMP-AF during the year 2017-2018.
(Contract Awarded)
25/02/2018 28/03/2018 Details Notice
Contract Awarded:
Contractor: Rahid Enterprise JV
Signing Date: 07/06/2018
Contract Value: 14756518.232
Commencement Date: 07/06/2018 Completion Date: 06/06/2019
36 SD-CF-KEX-I-W06-03 Re-excavation of 4.375km Hashemdia Khal from km 0.000 to km 4.375 in c/w Chatler-Fakurhat Sub-Project under SAIWRPMP-AF during the year 2017-2018.
(Contract Awarded)
25/02/2018 28/03/2018 Details Notice
Contract Awarded:
Contractor: M/S Sarbick International
Signing Date: 10/06/2018
Contract Value: 11487025.621
Commencement Date: 10/06/2018 Completion Date: 09/06/2019
37 SD-CF-KEX-I-W06-02 Re-excavation of 7.500km Fukurhat Khal from km 7.000 to km 14.500 in c/w Chatler-Fakurhat Sub-Project under SAIWRPMP-AF during the year 2017-2018.
(Contract Awarded)
25/02/2018 28/03/2018 Details Notice
Contract Awarded:
Contractor: M/S Amin & Co.
Signing Date: 11/06/2018
Contract Value: 26208026.105
Commencement Date: 11/06/2018 Completion Date: 10/06/2019
38 SD-CF-KEX-I-W06-01 Re-excavation of 7.000km Fukurhat Khal from km 0.000 to km 7.000 in c/w Chatler-Fakurhat Sub-Project under SAIWRPMP-AF during the year 2017-2018.
(Contract Awarded)
18/02/2018 20/03/2018 Details Notice
Contract Awarded:
Contractor: M/S Liton Treders
Signing Date: 22/05/2018
Contract Value: 34,047,249.78
Commencement Date: 22/09/2018 Completion Date: 21/05/2019